The Run-In
(click the image for pictures)
This was started the weekend after Ash Wednesday 2005. One delay after another caused it to fall behind the 6 week schedule. The run-in is 12'w x 24'l x 12'h (16'h at the center). It consists of 6" x 6" x 16' posts 3' in the ground every 6'. 2" x 4" stringers were placed 12" apart from the bottom to the top. The trusses were connected to the 6" x 6" x 16' posts with 1/2" bolts, twist nails and glue nails. The roofing is metal on 2" x 4" purlin placed 12" apart. The sides are T1-11 panels. The paint is a latex Hunter Green. This project was completed about May 14, 2005.